Skip to main content
Premium booster Power +1 … +3

Construction Schedule

In brief: Monthly Premium Bonus: Allows you to build multiple structures at the same time. From +1 to +3 in the queue.

Power+1 … +3
Power levels3
Active formonth

What it gives

Monthly Premium Bonus: Allows you to build multiple structures at the same time. From +1 to +3 in the queue.

Power by level

This is a flexible accelerator: the strength can be chosen from minimum to maximum. Reference levels:

LevelBonus power
1+1
2+2
3+3

Total power levels: 3. The higher the chosen power, the more expensive the bonus.

How it works

Paid inantimatter
Term1–30 days
Long-term discountup to −35%

A flexible premium bonus: you pick its power yourself and pay for the term you want (a month by default). It is paid in antimatter and stays active for the chosen number of days, stacking with permanent bonuses (research, senators, anomalies).

The longer the term, the cheaper it is per day: 7 days −5%, 10 days −8%, 14 days −12%, 21 days −21%, 30 days −35% compared with buying by the day. The exact antimatter amounts are shown in the game.

Real-money prices are not published here — they are flexible and visible in the game itself. The encyclopedia covers only what exactly an item gives.

Questions and answers

What does “Construction Schedule”?
Monthly Premium Bonus: Allows you to build multiple structures at the same time. From +1 to +3 in the queue.
How strong is the booster “Construction Schedule”?
The power can be adjusted in the range +1 … +3 — this is a monthly premium bonus.
How much does “Construction Schedule”?
Prices in real money are flexible and visible in the game itself — in the encyclopedia we publish only what exactly an item gives.

The Xterium knowledge base is maintained by the project team; data is verified against the game engine. About the project and team →

Verified data · Game version: 2.13.1